by galled » Sat Jul 19, 2025 4:10 pm
My guess would be there's no drain. Do you have an area with adjacent walls, floor, or ceiling to where you have plumbing that there may be space to build a half bath? Trying to retrofit a drain in a basement is really difficult (you have to dig into the basement floor, which mean cement much of the time) unless you want to get into pumps and stuff. (*Don't*) Water wants to go downhill.
Building a bathroom (a new room) out the side of your house might be an option too, but it needs to be near plumbing to be cost effective (like near the kitchen or laundry hook ups).
That's a relief the water damage has been handled. Did they find the source and address it?